Room-based heat pump
The Illustrated Guide to Mechanical Building Services, Third Edition (BG 31/2017), by David Bleicher, published by BSRIA in 2017, describes room-based heat pumps as:
‘Individual room units, which can be floor standing or concealed in a void, such as the ceiling, are all linked by a piped water circuit that runs around the building. Each unit operates independently and is able to heat or cool the air in the immediate area. This is achieved by means of a small heat pump in the unit which takes low grade heat from the water circuit and uses it to heat the room. To cool the room, the heat pump works in reverse to remove heat from the space and transfer it to the water circuit.
‘A key benefit of this type of system is the ability to save energy by transferring heat from an area where it is not needed to an area where it is. Any additional heating required by the system is provided by either a small boiler, electric heater or a link to a separate hot water circuit in the building. Any additional cooling is performed by one or more dry coolers or cooling towers which remove waste heat from the water circuit. As with fan coil systems, a separate ventilation system is be (sic) required.’
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- Absorption heat pump.
- Air source heat pumps.
- BSRIA articles on Designing Buildings Wiki.
- BSRIA definitions.
- BSRIA.
- Building services.
- Earth-to-air heat exchangers.
- Exhaust air heat pump.
- Ground source heat pumps.
- Heat exchanger.
- Heat pump.
- Heat recovery.
- Solar-assisted heat pump.
- Water source heat pumps.
Featured articles and news
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.